1. To change toilet wall and floor tiles in the office.
Toilet floor tiles in the office
2. To change toilet wall and floor tiles in the office next door belonging to the founder director of the company.
Toilet wall tiles in the office next door
3. To install a Weida water tank in the toilet for the office next door.
Current water tank in the toilet for the office next door.
4. To hack the wall next to the toilet to make room for a door in order that we can access to next door internally.
Wall to be hacked
Sink to be taken out to make room for the door at office next door
Today the contractor started hacking the old toilet wall and floor tiles next door. The noise was so unbearable. I am wondering how long it would take the contractor to finish doing everything.
After renovation, there would be a male and female toilet separately.
